Steps
Step 1
Attach the bottom (48") 1x6 stretcher to the two (35") coffee bar sides using 1 1/4" pocket hole screws and wood glue. The side with the pocket holes should be facing down. (All pocket holes will be made with a pocket hole jig on a 3/4" setting.)
Tools
Materials
![Step 1](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/e6e5d046d8224c06b2f418745a631922.jpeg)
Step 2
Attach the top (48") 1x6 stretcher to the two coffee bar sides using 1 1/4" pocket hole screws and wood glue. The side with the pocket holes should be facing down. (Pocket holes were made with a pocket hole jig on a 3/4" setting.)
Tools
Materials
![Step 2](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/007d042bdb754ef0a2aeb1fec616a353.jpeg)
Step 3
Attach the two middle (33") 1x6 boards to the bar using pocket hole screws and wood glue. The sides with the pocket holes should be facing outward. (Pocket holes made with a Kreg Jig on a 3/4" setting.) Boards should be 12" from the coffee bar side.
Tools
Materials
![Step 3](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/6d2ae81f21a14e38b472c9248db3eafb.jpeg)
Step 4
Attach the (12") 1x6 shelving to the coffee bar using pocket hole screws and wood glue. The sides with the pocket holes should be facing down. The top shelves should be 11" from the top and the bottom shelves are 11" from the bottom.
Tools
Materials
![Step 4](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/7ecaebc1e399447aab15f8747ee12175.jpeg)
Step 5
Assemble frame using 1 1/4" pocket hole screws and wood glue. (Pocket holes were made with a pocket hole on a 3/4" setting.) Note: Make sure to measure against your assembled coffee bar before making cuts for best fit.
Tools
Materials
![Step 5](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/68695ac53b35481795c29f360673cd42.png)
Step 6
Add coffee bar frame to coffee bar using a brad nailer, finish nails and wood glue.
Tools
Materials
![Step 6](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/c6fc865b09e844fbb705da2ce4aea18d.jpeg)
Step 7
Add (49 1/2"x35") 1/4" plywood to the back of the coffee bar using a staple gun and wood glue.
Tools
Materials
![Step 7](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/0e2452db2d8a4fef83aab4ce32b33ebb.jpeg)
Step 8
Fill all nail holes with DAP wood filler and let dry. Sand down the coffee bar with a corner cat sander and wipe off any dust.
Tools
Materials
![Step 8](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/84b9ea264657474db7cea31045686103.jpeg)
Step 9
Paint the coffee bar with two light coats of paint and let dry thoroughly. I used Behr Ultra Pure White.
Materials
![Step 9](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/a5ba4b73f83f42259f3a646af9b8e273.jpeg)
Step 10
Assemble Barn Door Hardware. 4 - Clothesline Pulleys; 4 - 2" Hex Screws; 4 - 1" Spacers; 1 - 1" x 1/8" x 96" Aluminum Flat Bar; 4 - 1/4" x 1" Hex Bolts; Pack of 1/4" washers; Pack of 1/4" locking nuts; 8 - Baby Hex Screws
Materials
![Step 10](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/c5603295211a4629a27e15ac0ca537a6.jpeg)
Step 11
Spray paint barn door hardware, drawer pulls, pipe and S hardware with color of choice (Rustoleum Metallic Finish), let dry and then spray with clear enamel spray.
Materials
![Step 11](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/8a108107a6fd4079af4fe7bc1e1257b5.jpeg)
Step 12
Assemble barn doors by adding (4 1/2") 1/4" mdf pieces to a sheet of (12"x35") 1/2" mdf. Space out the 1/4" mdf by placing two nickels in between. Secure with glue and clamp. Once the doors are completely dry, paint the doors and add handles.
Materials
![Step 12](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/6fdb14881b474ab8a39872cd31adaefc.jpeg)
Step 13
Cut the 1/2" pipes down to size with a pipe cutter. Pipes should be long enough to fit snug in the coffee bar. My pipes were 22 2/8".
Materials
![Step 13](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/1869d533fca341fab49eb689ddd05ff1.jpeg)
Step 14
Add 1/4" MDF pieces under piping for support. Attach with wood glue/brad nails. I placed my pipes based on the sizes of my coffee cups.
Tools
Materials
![Step 14](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/02682b5d5a964ed39446117053aba3e3.jpeg)
Step 15
Place the flat bar on the coffee center and drill through the holes in the bar. I drilled four holes in my bar for extra support. Once the holes are drilled, attach the flat bar to the coffee center using the spacers and 2" hex screws.
Tools
Materials
![Step 15](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/e0da25a948cb4ede8874829a519201b1.jpeg)
Step 16
Hang your pulleys on the flat bar and place your coffee bar door up against the coffee center. I placed a 1x6 under the door for proper spacing and then attached the pulleys to the door with baby hex screws. Use a level to screw evenly.
Tools
![Step 15](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/03b5150bc51941ac882b3bdc2e9a3be2.jpeg)
Step 17
Hang your S hooks and coffee cups, decorate and Enjoy!
Materials
![Step 17](https://2e1293630802db8d0d56-50fcdb1c10e3e49a3d1b0541a2f13b69.ssl.cf1.rackcdn.com/projects/steps/a9a98251e86d4e309963b350eb982c63.jpeg)